Investment objectives: To build urban infrastructure to serve the housing needs of local people as well as to attract outside investors. The construction of the project helps create the overall landscape of Hai Tan urban area with the surrounding area, creating an urban land fund to meet the needs of residential land for people in order to concretize the construction planning of Quang Ninh province to 2030, with a vision to 2050 and beyond 2050 and orientations of the general planning on construction of Mong Cai border gate economic zone to 2040, the regional planning of Hai Ha district, in line with Hai Ha master plan for socio- economic development which has been approved by the Provincial People's Committee in Decision No. 3276/QĐ-UBND dated December 30th 2014. Contributing to urban embellishment, synchronous and complete technical infrastructure system of the area
Project scale: The total land area proposed for project implementation is 34,202.4 m2 (3.42 ha), including the current residential land area for urban embellishment (not acquired, site clearance), adjacent housing areas. and area of works for external and internal roads and technical infrastructure. + Synchronously invest in technical infrastructure systems (roads, water supply and drainage systems, power supply systems, communication systems...) of the project and external traffic works, infrastructure Adjacent engineering includes: 03 corridors outside the project connecting with the regional traffic infrastructure system and handing over to Hai Ha District People's Committee for management after construction is completed. + Products of the project: 82 adjacent residential plots and 11 adjacent houses with rough exterior finishing with the following scale: The land plots are diverse, averaging from 95m2 to 100m2; corner lots with area >100m2. Maximum building density in the plot: 80%. Maximum floor height: 5 floors. The ground level of the 1st floor is higher than the pavement height: +0.2m. 1st floor height: +4.2m; 2nd floor is +3.9m high, 3rd floor is +3.6m high, tum is +3m high; 1.2m racing balcony. Total height of the building (calculated from the height of the ground floor of the 1st floor to the top of the roof) ≤ 18.4m from the pavement core. + Population size: about 472 people. - Preliminary total project implementation cost (m1): 72,130,000,000 (Seventy-two billion, one hundred and thirty million) VND
Project summary: -
Project implementation progress: Investment term: 04 years from the time of land allocation for project implementation. Investment progress: 02 years from the time of land allocation for project implementation.
Project location: Quang Ha town, Hai Ha district, Quang Ninh province
Land area: 34,202.4 m2 (3.42 ha)
Land use's purpose: Investment in infrastructure of new urban residential areas combined with embellishment of existing residential areas with synchronous technical infrastructure articulating with neighboring areas
Current status of the land area: Land area has not been cleared
Preliminary total project implementation cost: VND 72.130.000.000
Compensation, support and resettlement expense: VND 36.000.000.000
Deadline for investors to submit their project implementation registration document: 02/02/2023 16:30
Address, phone number, fax number of the Department of Planning and Investment: Quang Ninh Economic Zone Authority, Hong Ha ward, Ha Long city, Quang Ninh province. Phone number: 02033836573.