Procuring agency: The Northern Vietnam Power Projects Management Board-Branch of the National Power Transmission Corporation (EVNNPT-NPMB)
Name of procurement package: Package 02: Supply and Delivery of Insulators and Fittings for transmission line; ACSR Conductors, Insulators and Fittings for bay extension “Notice ref No.: 20190876780 - 00. Date of publication: 28/08/2019 16:00"
- Implementation period: 150 days
Project name: Upgrading 220kV Transmission line Hoa Binh-Chem and Ha Dong- Chem
Source of fund: The National Power Transmission Corporation (EVNNPT)
Method of bidder selection: International open bidding, one-stage two envelope bidding
Time of issuing bidding documents: from 08:00 am, 04 September 2019 to 09:00 am, 14 October 2019 (during office hours)
Place of issuing bidding documents: The Northern VietNam Power Projects Management Board, No.4 Nguyen Khac Nhu street, Ba Dinh district, Ha Noi, Viet Nam (Room 402, Block B). Tel: 024.39840823, 024.22103083, 024.22103081, 024.22103093; Fax: 024.39840824
Price of bidding documents: VND 4,000,000 or USD 200
Bid security: VND 319,000,000 or USD 14,000 through banks or branches which legally operate in Viet Nam
Bid closing time: 09:00 am, 14 October 2019
Bid opening time: 09:30 am, 14 October 2019.